DEPENDABLE. POWER. SOLUTIONS.

At Niagara Power Transformer, we are focused on the future of the power industry. We are investing in our facilities and testing & winding capabilities to continue giving you confidence in our commitment to quality, engineering and manufacturing excellence along with design nimbleness, and production flexibility – all while staying on fast and reliable shipping schedules.

What sets Niagara Power Transformer apart?

Certifications

Small business certified for federal contracting, UL,
CUL, RUS, DNV, ABS, Lloyd’s Register, EM UBC, CSA,
WEEE, RoHS, RoHS China, CE, IEC, GOST, BS, PIP, KC

Deep Industry Experience.

of transformer specific design experience

of transformer specific manufacturing experience

of transformer specific management experience

VP of Engineering is an

Long-term value-driven focus


  • Total cost ownership driven
  • Total cost of ownership driven
  • Superior engineering, LEAN, Six Sigma, and ROI-based investment analysis drive out non-value-added cost
  • Sensitive to first cost position in today’s competitive
    marketplace
  • Active in IEEE and IEC standards writing committees
    as chairman and in senior leadership positions
  • Conservative management and financial practices
  • Independent — no private equity, no debt


Nimble by design


    • Quick proposal and drawing turnaround times
    • Fast and reliable shipping schedules
    • Engineered to order; completely flexible to accommodate customer needs
    • Full bonding capability
    • In-house electrical and mechanical PE certification
    • Doble test reporting
    • Retrofits, tilt, offshore applications, low profile, high elevation, high ambient, highly corrosive atmospheres

Continuous Improvement


  • Complete physical segregation of tank fabrication and shot blasting from winding and assembly
  • Complete physical segregation of dirty from clean production activities
  • Multiple-bay, electrically and mechanically isolated, test facility with RF room
  • Positive pressure winding and manufacturing environment, strict humidity and particulate control, physically isolated and enclosed winding shop
  • State-of-the-art paint booth meeting IEEE C57.12.28, C57.12.29 and UL requirements as well as international paintings standards
  • Complete physical segregation of tank fabrication and shot blasting from winding and assembly
  • Complete physical segregation of dirty from clean production activities
  • Multiple-bay, electrically and mechanically isolated, test facility with RF room
  • Positive pressure winding and manufacturing environment, strict humidity and particulate control, physically isolated and enclosed winding shop
  • State-of-the-art paint booth meeting IEEE C57.12.28, C57.12.29 and UL requirements as well as international painting standards

OUR TRANSFORMERS, BY THE NUMBERS

From the test floor to the substation yard, we put our expertise to the ultimate test every day.

TEST FLOOR
FAILURE RATE


0.75%

over the last 10 YEARS

FIELD
FAILURE RATE


0.32%

over the last 10 YEARS

Sharp Facility


ISO

9001

80